1

Penmann completes major HVAC upgrade for the Liverpool-based Nutricia facility in line with FSI Phase 1 and 2

News Discuss 
Penmann has completed a tailored HVAC upgrade at Nutricia’s Liverpool facility, implementing a purpose-built ventilation and climate control system engineered to meet strict hygiene and production requirements. The contract covered the design, supply, installation and commissioning of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://bookmarks-hit.com/story23643144/penmann-ltd-completes-major-hvac-upgrade-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story